Going to try BRT’s again
After a break I am slowing getting back into streaming and creating Cities Skylines content using Neo South Auckland as my current example.
I usually upload both the RAW version for those wanting the entire run through of a city building session, as well as snippets highlighting specific elements like a piece of Urban Design or a Scene.
My latest raw run through from last week can be seen below. The focus was on building the supporting infrastructure for the Riccarton Centre I was also building alongside. This is my second ever attempt in 6 years to build Bus Rapid Transit (it is not my normal play style as I use the rail types more) given I have actual dedicated BRT assets available to do so.
So how did it map out and where will this lead next run through?
I will fetch highlights of the completion of Riccarton Centre, the set up of Riccarton South as a residential support node, further establishment of more residential for the City, and the full operation of one if not two of the Rapid Bus Transit Lines.
The photos below give a preview of this:














More soon.